Maglev Test Ride 27 October 2005
IMAGES FROM THE TOUR
Briefing by JR Central representatives Tomokazu Minesaki and Motoaki Terai
A "Concorde like feeling before take-off"
A couple of second to view the scenery before next tunnel.
Participants posing for a photo after the test ride
The MLX01-901 test train, the length of the nose indicates some serious speeds...
The train leaving the test center terminal
Participants waiting for the train to pass on the foof-top of the test center building
Cameras ready to shoot, there's not many seconds time
Train approaching from Tokyo side at 500 km/h....
..and one second later, 140 m further....
Inspecting the train from the roof-top
The control center which oversees the test runs and collect all test data.
Q & A session with JR Central representatives Kevin Ichikawa, Tomokazu Minesaki and Motoaki Terai
Leaving the test center one impressive experience richer.
Before heading back to Tokyo, the group visited Honka Design Center in nearby Yamanaka-ko.
Honka Japan Inc's Hiro Okabe (right) guides.
The group departing with Mt. Fuji in the background.
Mt. Fuji on the way back.
©2005 Finnish Chamber of Commerce in Japan. All rights reserved.
Mail to
Webmaster